Case Study
School Extension, Preston
The original brick that this school was built from was still manufactured, however it was on 22 weeks availability.
Matching Brickwork supplied a plain 'buff' brick that matched in texture and then a Matching Brickwork Technician attended site after building and colour match the brick to blend seamlessly.
The local planners and the school required a sample panel for approval prior to work being completed on site so we supplied a sample panel and attended site to colour match and blend the sample area ready for approval by the client and local authority.
Matching Brickwork supplied a plain 'buff' brick that matched in texture and then a Matching Brickwork Technician attended site after building and colour match the brick to blend seamlessly.
The local planners and the school required a sample panel for approval prior to work being completed on site so we supplied a sample panel and attended site to colour match and blend the sample area ready for approval by the client and local authority.