Case Study
Brick Match, Berkshire.
The brick type that this property had been built from had long been discontinued from production by the brick manufacturer which left the builder with a brick matching problem when converting the garage.
We supplied a brick that matched the texture of the original brickwork and then a Matching Brickwork Technician colour matched the brickwork to match perfectly after it had all been constructed.
We supplied a brick that matched the texture of the original brickwork and then a Matching Brickwork Technician colour matched the brickwork to match perfectly after it had all been constructed.